A company with a renewable electricity target has to decide whether to keep meeting it with annual certificates and green tariffs, or to sign supply that matches its consumption hour by hour on its own grid. The GHG Protocol is moving toward the second without saying when.
Its consultation on scope 2, which ran from 20 October 2025 to 31 January 2026, proposed that certificates count in the market-based method only if they are matched to hourly consumption and come from grid regions that can deliver to the buyer. Its update of 16 October 2026 reports two camps in the responses: one for hourly matching, delivery on the same grid and new plants, and one for annual matching across wide regions to keep the certificate market easy to join.
The Independent Standards Board's direction since September is a compromise. Until a date still to be set, companies may keep reporting under the 2015 rules, called Method 2, though the board says they should use Method 1, with its hourly matching, deliverability and new-plant tests. After that date, a company reporting market-based emissions shall use Method 1 if data meeting the quality criteria exists. A consolidated consultation is set for the second quarter of 2027 and a joint GHG Protocol and ISO standard for the fourth quarter of 2028.
India's grid makes hourly matching harder for a plant that runs at night. Ember puts solar at 9.4% of India's 2025 demand, and wind and solar together at 14%, with fossil fuels at 73% of generation. Open access helps: the 2022 Green Energy Open Access Rules cut the threshold for buying green power to 100 kW.
The EU has already written hourly matching into one rule. Its 2023 delegated act on renewable hydrogen requires matching within the same month and, from 2030, the same hour, with member states allowed to require hourly matching from 2027, Linklaters noted.
Our judgment is that the 2028 standard keeps annual certificates as an option until at least 2030, so nothing is stranded in the next three reporting years. We are wrong if the 2027 consultation draft makes Method 1 mandatory before 2030.
We would stop adding annual certificates bought far from your plants and put the next tranche of renewable spending into wind, storage or round-the-clock supply on the grids where you consume. On the direction published so far, that kind of supply is the kind both methods would recognise.
Sources (4)
- GHG Protocol, Scope 2 Market-based Method Update: From 2025-2026 Public Consultation to Current Status (16 October 2026)
- Ember, India country profile (2025 electricity data)
- Ministry of Power via PIB, Green Energy Open Access Rules (19 July 2022)
- Linklaters, EU Commission publishes delegated act on green hydrogen (22 February 2023)